Important Railway bridges for Central Railway, Ahmadnagar

Project: Exploration, Design and preparation of structural drawings / working
drawings including Proof checking for Important Railway bridges 272/1 (BHIMA
RIVER ), 439/1 (Godavari River), 401/1 (Pravara River), 390/1 (Mula River) and
major/important bridges for Manmad Entry Arrangement in connection with of
Daund Manmad Doubling.

Client: Central Railway, Ahmadnagar

Description of Service:
1. Detail engineering survey at various locations of sites and preparation of GAD.
2. Topographical Survey
3. Conducting geotechnical investigation at all locations of bridges.
4. Design and Drawing of Bridges.
5. Designing and preparation of structural drawings/Working drawings including designing of foundation, substructure (i.e. abutments, piers etc.), superstructure as per Railway specification, relevant codes, IS codes and additional special conditions of the tender for Important Bridge.
6. Proof Checking.
7. Preparation of detailed execution plan and 3D.
8. Preparation of completion drawing after construction of bridge.