Sr |
Name of Project |
Bridge Type |
Client/ Contractor |
1 |
Detailed design of Bridge over Barpullah Nal Ring Road Sarai Kale Khan Delhi |
RCC bridge over pile foundation |
PWD, Delhi |
2 |
Detailed design of suspension bridge of 135m span at Ghahgharia Uttakhand |
Suspension bridge |
PWD, Uttrakhand |
3 |
Detailed Design Consultancy of 12 nos at different location at Odisha |
Prestressed super structure /Steel composite with RCC substructure and pile foundation |
Bridge & Roof Co. (I) Ltd, Kolkata |
4 |
Detailed design consultancy Services of 10 nos bridges/ROB/RUB at Jaipur for JDA |
Prestressed super structure /Steel composite with RCC substructure and pile foundation |
Jaipur Development Authority, Jaipur |
5 |
Design of two nos Bridges at Haridwar for SIDKUL Uttrakhand |
RCC bridge over open foundation |
SIDKUL, Uttrakhand |
6 |
Detailed Design of 3 nos Bridges 2 at Sawai Madhopur and One at Karauli District in the State of Rajasthan |
Prestressed Pretensioned Girder with Pile Foundation |
RUIDP, Rajasthan |
7 |
Detailed Design of 5 nos Bridges at RSVY Madhubani, Bihar |
RCC Girder super structure with RCC substructure and pile foundation |
SOWIL |
8 |
Detailed Design of 2 nos Rail Over Bridges at NH-1, Jalandhar |
PSC Super Structure resting over Pile foundation |
NHAI |
9 |
Detailed Design of 1 nos Rail Over Bridges at Delhi – Saharanpur x-ing no 3 km 63+0 |
PSC Super Structure resting over Pile foundation |
NHAI |
10 |
Detailed design of 1no bridge at Jalmahal Jaipur |
RCC BOX |
KALPTARU |
11 |
DDA Dwarka 1no.Bridge sector Delhi |
RCC BOX |
DDA |
12 |
DPR Consultancy for 8nos. Bridge works under PMGSY Package No.-8 P.I.U. Dewas |
RCC Super Structure resting over Well/Open foundation |
MPRRDA |
13 |
DPR Consultancy for 9nos. Bridge works under PMGSY Package No.-5 P.I.U. Rajgarh (Biora) |
RCC Super Structure resting over Well/Open foundation |
MPRRDA |
14 |
DPR Consultancy for 11nos. Bridge works under PMGSY Package No.-6 P.I.U. Jabalpur |
RCC Super Structure resting over Well/Open foundation |
MPRRDA |
15 |
DPR Consultancy for 12nos. Bridge works under PMGSY Package No.-7 P.I.U. Umaria |
RCC Super Structure resting over Well/Open foundation |
MPRRDA |
16 |
DPR Consultancy for 8nos.Bridge works under PMGSY Package No.-4 P.I.U. Dhar-1 |
RCC Super Structure resting over Well/Open foundation |
MPRRDA |
17 |
DPR Consultancy for Cantonment 18km roads with drainage system in Assam |
RCC Super Structure resting over Well/Open foundation |
MPRRDA |
18 |
DPR Consultancy for 15km Light Monorail based Mass Rapid Transit System for City of Indore |
RCC Super Structure resting over Well/Open foundation |
MPRRDA |
19 |
Detailed design 4-Lane flyover at civil line metro station at Jaipur. |
RCC Super Structure resting over Well/Open foundation |
MPRRDA |
20 |
Preparation of DPR of approx 90km road at Jhajjar |
DPR |
HSB&R Corp |
21 |
Exploration and Preparation of GAD, Detail working drawings and Design for Road Over Bridges (ROBS) 23nos in deep cutting from Kada to Parli in connection with Ahmednagar-Beed-Parli Vaijnath New Broad Gauge Line Project |
Steel Composite Super structure resting over Open foundation |
Central Railway, Ahmednagar |
22 |
Consultancy Service For Design, Drawing and Bill of Quantity for Construction of 30.00 Mtr Span Minor Permanent Bridge on Open Foundation Over Hmarluang at Km 98.101 on Lawngtlai-diltlang-Parva Road Under 71 RCC/ HQ 24 BRTF Project Pushpak In Mizoram State |
Balance Cantilever PSC Box Girder resting over well/open foundation |
Border Road Organization, Mizoram |
23 |
Design, Drawing and Bill of Quantity For Construction of 25.00 Mtr Span Minor Permanent Bridge On Open Foundation Over Nengpuilui-l at Km 116.815 on Lawngtlai-diltlang-parva Road Under 71 RCC/ HQ 24 BRTF Project Pushpak In Mizoram State . |
Balance Cantilever PSC Box Girder resting over well/open foundation |
Border Road Organization, Mizoram |
24 |
For Design, Drawing and Bill Of Quantity And Verification Of Hydraulic Data For Construction of 25.00 Mtr Span Minor Permanent Bridge On Open Foundation At Km 125.720 On Lawngtlai-diltlang-parva Road Under 71 RCC/ HQ 24 BRTF Project PM State. |
Balance Cantilever PSC Box Girder resting over well/open foundation |
Border Road Organization, Mizoram |
25 |
Consultancy Service for Design, Drawing and Bill of Quantity and Verification of Hydraulic Data For Construction of 25.00 Mtr Span Minor Permanent Bridge on Open Foundation at Km 122.80 on Lawngtlai-diltlang-parva Road Under 71 RCC/ HQ 24 BRTF Project Mizoram State. |
Balance Cantilever PSC Box Girder resting over well/open foundation |
Border Road Organization, Mizoram |
26 |
Design, Drawing and Bill of Quantity for Construction of 50.00 Mtr Span With PSC Box Girder Superstructure Major Permanent Bridge on Open Foundation Over River Tuisa at Km 22.50 on Khungphah-new Vaikhawtlang-kawlbem Road 74 Rcc/Hq 24 Brtf Project Pushpak In Mizoram State. |
Balance Cantilever PSC Box Girder resting over well/open foundation |
Border Road Organization, Mizoram |
27 |
Design, Drawing and Bill of Quantity For Construction Of 30.00 Mtr Span Minor Permanent Bridge T-beam Superstructure Over Dampa Rengpuilui At Km 121.270 On Sairang-tuipuibari Road Under 115 RCC/HQ 765 BRTF Project Pushpak In Mizoram State. |
Balance Cantilever PSC Box Girder resting over well/open foundation |
Border Road Organization, Mizoram |
28 |
Design, Drawing and Bill of Quantity for Construction of 30.00 Mtr Span Minor Permanent Bridge T-beam Superstructure Over Dampa Rengpuilui At Km 121.730 On Sairang-tuipuibari Road Under 115 RCC/HQ 765 BRTF Project Pushpak In Mizoram State. |
Balance Cantilever PSC Box Girder resting over well/open foundation |
Border Road Organization, Mizoram |
29 |
Feasibility Study Preparation Of Hydraulic Data Gad Design Drawing SSI DPR On BOQ Approach Road Proof Checking through NIT IIT For Bridge Lantakkhola at Km 72.20 on Gangtok Chungthang Road In Project Swastik In Sikkim. |
Balance Cantilever PSC Box Girder resting over well/open foundation (1x30+1x50+1x30) |
Border Road Organization, Swastik, Sikkim |
30 |
Feasibility Study Hydraulic Data Gad Detailed Design Drawing SSI DPR on BOQ With Approach Rd And Proof Checking Of Design DRG Through NIT IIT of BR at Km 11.17 on Yumsomdong’S Yumsomdong’N In Project Swastik In Sikkim. |
Balance Cantilever PSC Box Girder resting over well/open foundation (1x60) |
Border Road Organization, Swastik, Sikkim |
31 |
Feasibility Study Preparation of Hydraulic Data Gad Design Drg SSI DPR on BOQ Approach Road Proof Checking Through Nit Iit For Bridges On Gangtok Chungthang Road In Project Swastik In Sikkim . Mannual, Mayangchu, Pengog Bridges |
Balance Cantilever PSC Box Girder resting over well/open foundation (1x110), (1x45)(1x30+1x60+1x30) |
Border Road Organization, Swastik, Sikkim |
32 |
Feasibility Study Hydraulic Data Gad Detailed Design Drawing Ssi DPR on Boq With Approach Rd And Proof Checking Of Design Drg Through Nit Iit For The Bridges On Chungthang Lachen Rd In Project Swastik In Of Sikkim., Chhaten, Bonsoi, Taramchu bridges |
Balance Cantilever PSC Box Girder resting over well/open foundation (1x30), (1x75)(1x40+1x80+1x40) |
Border Road Organization, Swastik, Sikkim |
33 |
Feasibility Study, Preparation of Hydraulic Data,GAD , Detailed Design And Drg, Ssi, Preparation Of DPR On BOQ Basis With Approach Roads And Proof Checking Of Final Detailed Design & Drawing From Iit For The Bridges Phimpchu At Km 1.775,teesta New At Km 3.435, Prakash Setu At Km 6.100 And Rabamchu At Km 9.950 On Chungthang-lachen Road Under Project Sikkim State |
Balance Cantilever PSC Box Girder resting over well/open foundation (1x70), (1x75)(1x90) (1x80) |
Border Road Organization, Swastik, Sikkim |
34 | Consultancy Services for Authority’s Engineer of Rehabilitation and up gradation to 2 lane with paved shoulder configuration from existing Km. 122.00 (Dharasu bend) to Km 147.230 (Silkyara bend) (design chainage 0.000 to Km 24.30) of NH-94 (New No. 134) in the State of Uttarakhand. | National Highways Circle, PWD, Dehradun | |
35 | Appointment of Authority’s Engineer for Supervision of Civil Construction Work – Reconstruction with geometric improvement of existing intermediate lane to 2 lane with paved shoulder configuration from km 28.600 to km 59.420 of NH – 94 in the State of Uttarakhand on EPC Mode (RFP10) | MORTH, Dehradun | |
36 |
Feasibility study and Preparation of Detailed Project Report for 2/4 lane road with paved shoulders of Bhivapur- Paoni- Adayal- Bhandara sections of National Highways in the State of Maharashtra Length : 55km. |
Preparation of DPR including Topo survey, SSI, Traffic, Environmental, BOQ, Costing, Geometry design, Bridge design etc |
Ministry of Roads, Transport and Highways / Nagpur PWD |
37 |
Project Management Phase I including Preparation of Detailed Project Report of new NH No. 85 near Adimali connecting Cheruthoni, Painavu and terminating at its junction with new NH No. 183 near Kumily in the State of Kerala. of National Highways/ State Roads (approved “In Principle” for declaration as National Highways) for up gradation to Two/Four lane with paved shoulder configuration. Length : 97Km. |
Preparation of DPR including Topo survey, SSI, Traffic, Environmental, BOQ, Costing, Geometry design, Bridge design etc |
Indian Academy of Highway Engineers |
38 |
Feasibility study and Preparation of Detailed Project Report for improvement and up-gradation from Karmaini (junction on NH- 24 near Compierganj) – Menhdalwal Kahliabad - Dhanghata - Ramnagar – Nyori (junction on NH-28) - Azamgarh =105 km, Basti - Mehdawal - Kaptanganj =92 km in the State of Uttar Pradesh. Length : 197Km |
Preparation of DPR including Topo survey, SSI, Traffic, Environmental, BOQ, Costing, Geometry design, Bridge design etc |
Ministry of Roads, Transport and Highways / Uttar Pradesh, PWD. |
39 |
Authority’s Engineer for Supervision of project of Two/Four Laning with Paved Shoulders of Govindpur (Rajgunj)-Chas-West Bengal Border section of NH-32 from km. 0.000 to km. 56.889 in the state of Jharkhand under NHDP Phase-IV on EPC mode. |
Supervision of work including qualitty control etc |
National Highways Authority |
40 |
Detailed Design Consultancy Services for Approx 700 m Bridge over Nala at Kidwai Nagar Delhi |
Detail design consultancy steel composite superstructure resting over pile foundation |
PWD Delhi |
41 |
Detailed Design Consultancy Services for Approx 35 m Bridge over Nala at Mayur Vihar Ph-1 Nagar Delhi |
Detail design consultancy steel composite superstructure resting over pile foundation |
PWD Delhi |
42 |
Detailed design Consultancy services for FOB at No. of Locations in Delhi and road signage at all over Delhi during common wealth Game |
Details design consultancy of FOB’S and Signage |
PWD Delhi |
43 |
Consultancy Services for Feasibility Study, Preparation of Hydraulic Data, General Arrangement Drawing (GAD), Detail Design and Drawing for PMT Bridge, SSI for Bridge, Preparation of DPR On BOQ with approach road and Proof Checking of Design and Drawing through NIT/IIT of Bridge for 220 Mtr Approx Span Maj PMT Ritchu Bridge At KM 83,170 On Road Gangtok-Chungthang Under 758 BRTF/Projec Swastik in Sikkim State (Job No. 303/504) |
Balance Cantilever PSC Box Girder resting over well/open foundation |
Border Road Organization, Mizoram |
44 |
Consultancy Services for collection of Hydraulic data conducting of SSI and detailed design of bridges of 340M Extra dose bridge, 120m span, 65m span and 50m span bridge in the state of Mizoram for Project Pushpak Boader Road, Organization |
Extra dose, Continous Cantilever, PSC Box simply supported etc. |
CE Pushpak BRO |
45 |
Consultancy Services for carrying out feasibility study and detailed project preparation for redesigning, Rehabilitation and Up-gradation to 2-lane with paved shoulders or its strengthening of Juction with NH-154 at Dramman Sihunta-Chowati-Jot-Chamba-Koti-Tissa-Traila-Bairagarh-Killar in the State of Himachal Predesh. |
Length : 271 Km |
Ministry of Roads, Transport and Highways/Himachal Pradesh PWD |
46 |
Consultancy services for Authority's Engineer for Supervisi of Civil construction words reconstruction with geomatric Improvement of existing Intermediate Lane to 2 Lane with paved shoulder configuration from km 28,600 to km 59,420 of HM-94 in the state of Utterakhand on EPC mode |
Length : 30.28 KM |
Ministry of Road Transport & Highways Project Implementation Unit, Dehradun |
47 |
Consultancy Services for Authority's Engineer of Rehabilitation and up gradation to 2 lane with paved shoulder configuration from existing km. 122.00 (Dharasu Bend) to km 147.230 (Silkyara bend) (Design Chainage0.00 to km 24.30) of HM-94 (New No. 134) in the state of Uttarakhand. |
Length : 24.30 Km |
Public Works Department, Uttarakhand |